The Maritime History of the Great Lakes
S. F. Gale (Brig), U22343, 1 Oct 1853


Description
Full Text

REPAIRING. - The brig WILLIS goes in the dry dock of Jordan & Alcott to-day, says the Chicago Dem. Press, in order to be recaulked. She will come out in two or three days, when the brig GALE will be taken in at the same dock. The latter vessel is to be arched and kneed, and thoroughly overhauled. These repairs will require some five or six days.
      Buffalo Daily Republic
      Saturday, October 8, 1853


Media Type:
Text
Newspaper
Item Type:
Clippings
Notes:
repairing
Date of Original:
1853
Subject(s):
Local identifier:
McN.E.1988
Language of Item:
English
Donor:
William R. McNeil
Copyright Statement:
Copyright status unknown. Responsibility for determining the copyright status and any use rests exclusively with the user.
Contact
Maritime History of the Great Lakes
Email
WWW address
Powered by / Alimenté par VITA Toolkit




My favourites lets you save items you like, tag them and group them into collections for your own personal use. Viewing "My favourites" will open in a new tab. Login here or start a My favourites account.










S. F. Gale (Brig), U22343, 1 Oct 1853