The Maritime History of the Great Lakes
Door County Advocate (Sturgeon Bay, WI), 17 Sep 1908


Description
Full Text

Port of Manitowoc. The tug N. Bout in of Grayling Bros. Dredge and Dock Co., was placed on the boxes of the Manitowoc Dry Dock Co., for bottom leak, a new piece of planking and repairs to the rudder, etc. The Bout in left for Muskegon Sunday evening to assist the tug Birkenhead in towing Grayling Bros. No. (unsure) dredge and dumps to the So, where the company has a two years' contract to fill. The outfit had been stationed at Holland and the Birkenhead towed the fleet as far as Muskegon alone. The Bout in will wait on this (unsure) dredge at the So, while the Birkenhead will return here to wait upon the Co's dredge No. 9.


Media Type:
Newspaper
Item Type:
Clippings
Date of Publication:
17 Sep 1908
Language of Item:
English
  • Wisconsin, United States
    Latitude: 44.83416 Longitude: -87.37704
Donor:
Eric Bonow
Creative Commons licence:
by [more details]
Contact
Maritime History of the Great Lakes
Email
WWW address
Powered by / Alimenté par VITA Toolkit




My favourites lets you save items you like, tag them and group them into collections for your own personal use. Viewing "My favourites" will open in a new tab. Login here or start a My favourites account.










Door County Advocate (Sturgeon Bay, WI), 17 Sep 1908