Door County Advocate (Sturgeon Bay, WI), 30 Nov 1871
- Full Text
Marinette. The Eagle says the manufacturing establishment of Curry & Bagley is to be rebuilt next spring. The track of the C. & N.W. R.R. was to be completed to Peshitgo on the 27th. The tug I. Stephenson sank in the harbor on Wednesday. She was pumped out sufficient to be towed to the dock the next day.
- Media Type
- Newspaper
- Text
- Item Type
- Clippings
- Date of Publication
- 30 Nov 1871
- Language of Item
- English
- Geographic Coverage
-
-
Wisconsin, United States
Latitude: 44.83416 Longitude: -87.37704
-
- Copyright Statement
- Copyright status unknown. Responsibility for determining the copyright status and any use rests exclusively with the user.
- Contact
- Maritime History of the Great LakesEmail:walter@maritimehistoryofthegreatlakes.ca
Website: