Maritime History of the Great Lakes

Marine Review (Cleveland, OH), September 1912, p. 283

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

September, 1912 THE MARINE REVIF W < 280 for several months of the exact work the cost entry is always added, be- with the estimates, as described fur- done by each mechanic. This record cause revisions are constantly being ther on. was checked daily by one of the es- made to keep step with changes in timators, and notation made of the the wage schedule, improved meth- Material Cost File surroundings and circumstanc s un- ods of doing work and increased effi- eu ; oe : : : : stor e . der which the work was done. The ciency of the working force. s the storekeeping is done by a separate department having offices in a separate building, it is inconvenient oo Mee Malan _ for the estimators to obtain the cost TIME TRADES ESTIMATE || QUANTITY KIND EST. COST of raw material direct from the stock Suop- K. aes 22" IRON Are @ °18 cies ledgers; and a = material cost file im PLATFORM. 466 lps. @ -06 27 |96 || 50-L85. | Wror JreEL @ .02 00 1 rae t : SHeP.D". 250- [Bs. io Plate @ BlaG the estimating department, therefore, CasTINGs For STANCHIONS. 35 las. @ -10 3/50 || 216- Las. |3"~ oe 02 tee saves time. Material costs: are en- SsHop-"C" Evers ANO Bouts ter a3. a ue ; CurTINg ANO THREADING 4-Pieces 2z Pre 43- LBs. | 12" Brass Are ofr @- 6 | 88 pied Ee holt) cards, as @ .40 1 |60 || 84- Les. | |" " 48 Fr. @ in 13 | 28 shown in Fig. 2. These costs are re- Beeaxing & Maxing-8 Screwed Joints @-20 5 60 || 35-65. semar Brass oP Welt For 3\as vised monthly, if changes have oc- ' 0 . ' ae = See. oe : Shrccieaieoua: Lloo curred. When a large quantity of S-Hes.| 3x3" ANGLE Frame @ -96 4 | 30 ToTAL For One 510 | 39/46 4 certain kind of material is needed, I2- Hes. Feet For 2-PirE Stancions @ 1-22 14 | 64 w © BOTH Sines) 9-7 8 OZ Suop -"Me" | the state of the stock in the store- 4-Hrs. couar ncaa Tuse : 80 hy rect. house is investigated at the time the - Ww : 0 N : : Lo ya hag Og ee Sad 5 <i SHoP K 27.96 x -45 2 |59 estimate is made. If the quantity is lee Fir SEMAPHORE To New Location &secure| , I! | 20 5 c.- - 60 x ae 2 ye small it is assumed that the stock ae pe ar TwarP soinecniony 5 | 60 : "Gen 33. oe 50 16 | 80 on hand will suffice. If material is 8-Hes.| 3-Lasorees To HANDLE Heavy weigurs 6 | 00 » |"La"-- 6.60 -- a i, on hand which does not exactiy mect fetes as ee ise Ms for Soak aoe 102/04 the requirements, but which will answer the purpose, the expediency of using it instead of buying especial- : ly for this job is investigated, so as Fic, 4--Front oF Carp to keep the stock down to the low. est limits possible. data were then classified and an- Unit costs as well as unit times aie Stock lists of old salvage material alyzed. The maximutn, minimum and usually. recorded, because the esti- - recovered from other tepair and alter- average costs of each unit were then mator can compile an estimate more ation jobs are also kept Qn hle, so entered on 'the cards; Unit. costs "quickly "from the former than trom that the use of such material may be wele cbtained in this manner for: the latter. The unit cost is merely specified wherever practicable. The cutting and threading pipe o: all an extension of the unit time multi- die books. showing what fittings can sizes, 'making and breakiny "jomts, plied by the rate of pay of the me- be obtained as drop forgings are also both flanged and screwed, removing chanic or gang doing the work. A 02 file in this office. and re-setting plumbing fixtures and brief note giving the source from As many estimates can best be valves oi all descriptions, lead lining piping of all sizes, and the other in- numerable details entering elmo No. 825229... ESTIMATE am oe ey BIRMINGHAM | 10 LET C,O.let.4/7/12. Co SHIP ITEM NO ETTER plate cud ee - Build semaphore stands on after side of bridge and instell these unit costs even a ae olvel Senennores on same. The semaphores are now installed on the : imexperienced estimator can now bridge and on account of small size of bridge it is too much build up a reasonably accurate esti- congested. mate. J. 0. No, J.0.worpinc Build semaphore platforms at after : : end of bridge, port and starboard, as shown on afm. plementary. time, «aay Made plan 30-E-204. Re-locate signal iockers and. in this manner differs chiefly from a after eee rail to suit new ee stop watch time study in that it in- : | | dicates the performance which can : ae eG 3 be expected on a future job under the existing condition of organiza- "ESTIMATE tion and management. As it is the object of the estimator to build up cea 196-00 : the anticipated cost of a job from INDIRECT 102.00 data representing actual working con op ae 56 60 ditions in the plant, time 'studies : made in this manner are much more deus 377.00 valuable to him than 'scientific stop -- tme 12 days : watch time _ studies. ee | TT] nsifedur MATER ApHEBULE yoseo | It will be noted that a column is - provided on the card shown in Fig. . Fie; 4-- RACK oF Carn 1 for the cost of material as well as of labor. The material column is not which the unit was obtained, that made on the weight basis, a file has generally filled out, and is provided is, the previous job, time study, or been compiled of the _ weight OT 2 only for unit costs where a great route sheet data, is. entered wherever large number of fittings and standard variation in the market price of ma- possible, as this information is very material entering into ship construc- terial is not likely, as a separate ma- valuable in connection with the in- tion. This file is especially useful terial cost file is kept. The date of vestigation of costs that do net agree for estimating the cost of castings,

Powered by / Alimenté par VITA Toolkit
Privacy Policy