Maritime History of the Great Lakes

Marine Review (Cleveland, OH), May 1915, p. 190

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

SV Meet EO, SES. EEE A AEE : WHAT HAPPENED TO THE AJAX WHEN TESTED WITH SLIGHTLY LESS THAN MAXIMUM LOAD When subjected to a test load of 120 tons, the boom failed with the result shown above. This crane was chosen by the Canal Commission in preference to an American built machine. From four to six months will be required to repair it. Courtesy Leslie’s Weekly—Copyrighted. O61 MALAAY ANIYVW AHL SI6I ‘API

Powered by / Alimenté par VITA Toolkit
Privacy Policy