Maritime History of the Great Lakes

Green's Marine Directory of the Great Lakes, 1920, p. 8

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

The Interlake Engineering Co. Call: E. H. DADD A. W. THOMSON GEO. Home: Mario 875-W President and Treasurer Plant: Harvard 76 M. STEINBRENNER Secretary Ship Repairs "'â- 'â- - Oxy Acetylene Boiler Con- L. , Hfflte 1 ^ _. Cutting and Welding struction Marina Re- and Repairs construc- Electric Weld- tion ing « Night Work Reconstructed for Ocean Service at our Yard for U. S. Shipping Board. Repair Barge Tug "Eureka" fully equipped for Hull and Boiler Re-" INTERLAKE" pairs and Electric Welding Plant and Office: Cuyahoga River, at Jefferson St. Bridge 8

Powered by / Alimenté par VITA Toolkit
Privacy Policy