Marine Review (Cleveland, OH), 23 Sep 1899
- Full Text
Manager D. E. Ford of the Superior Ship Building Co. says that no special obstacles have been encountered in the new dry dock that is under way at the head of the lakes. The delay has been due almost entirely to the long rainy season just closing, which caused the cutting away of slopes of the dock. If the weather had been of the ordinary kind, the dock would probably have been completed by this time. The work has been progressing very favorably and it is now probable that the dock will be ready for use by the early part of November.
- Media Type
- Newspaper
- Item Type
- Clippings
- Date of Publication
- 23 Sep 1899
- Language of Item
- English
- Geographic Coverage
-
-
Wisconsin, United States
Latitude: 44.83416 Longitude: -87.37704
-
- Donor
- Eric Bonow
- Creative Commons licence
- [more details]
- Copyright Statement
- Copyright status unknown. Responsibility for determining the copyright status and any use rests exclusively with the user.
- Contact
- Maritime History of the Great LakesEmail:walter@maritimehistoryofthegreatlakes.ca
Website: